/2
Goal
Complete bathroom refurbishment program. Re-board the loft New gutter down pipe
Work carried out
All works conducted by myself - plumbing, electrical lighting upgrade, plastering, tiling
Result
Removal of the bath and install a walk in shower
Standout features
Position of the window created limited space for the shower screen